2011 EIR/EIS
- Final Table of Contents for FEIR
- UTR Public Final EIR/EIS/EIS Volume IV
- UTR Public Final EIR/EIS/EIS Volume V
- Appendix K – LVSRA GPA Description
2010 Draft EIR/EIS
Upper Truckee River Restoration Feasibility Report. River Run 2006
On March 6, 2006, River Run Consulting of Truckee led a team of consultants in a study that resulted in a 112-page report on the feasibility of restoring the Upper Truckee River.