Alternative 2 Enlarged Map

Alt 2: The five golf course bridges that cross the river would be removed and replaced with a single bridge crossing that spans the floodplain downstream of the hole 7 bridge. The new bridge would be designed to accommodate public use and tie existing trails on west side of the river to new trails on the east side of the river. New trails would be constructed on the southeast side of the river in the area where the golf course is removed that tie into the corner of Country Club and the new paved bike path near the clubhouse.